CX LRG

Reduce vibration, torque and frictional drag
Prevent corrosion and minimises stuck pipe
Improves productivity, run length and core recovery
Adheres to the rod under virtually any condition, increases drilling efficiencies
Stable at high pressures and temperature
Dosage: 1.0 to 2.0 liter/m3 (hole depths 0-500m); 2.0 to 4.0 liter (500-1500m); Min 5 liter (Min 1500m)
Package: 25 liter/drum